Speak with authority, quality is trustworthy.

Exterior wall really stone paint construction at the grass-roots level how should we deal with?

by:Opal     2021-01-18
Really stone paint is commonly used in the exterior decoration of exterior wall coating. Really stone paint has natural color, natural stone texture, a variety of line design, and can provide all kinds of solid structure. It can vividly show the beauty of the whole building elegant and solemn. Really stone paint must be properly handle before construction at the grass-roots level surface, otherwise the result will be greatly reduced. Next, I will share with you some really stone paint basic processing method. Exterior wall really stone paint base processing method is as follows: 1. Surface quality: the flatness and vertical degree of grassroots should conform to the requirements of general plastering engineering quality standards. Have a hole at the grassroots level should be repaired after cutting with machines and tools. If there are any cracks, loss of edges and corners, uneven quality defects, should adopt flexible polymer cement putty or exterior wall putty to repair the leveling. Construction must be bored with child after the completion of at least 12 hours to prevent rain, sun, and the frost. 2. The moisture content: the moisture content at the grass-roots level shall not be greater than 10%. In general, the summer dry 14 days, 21 days of the winter dry, water content can meet the requirements. Water content of grassroots can roughly judge by laminating method. Method is to use plastic cover 24 hours at the grass-roots level, no obvious wetting. 3. Ph: high basicity at the grass-roots level will influence the adhesion, layering, and discoloration of the coating quality accident. Measurement method can be soaked cotton with water, and then absorb under test on the alkali content at the grass-roots level, after a few minutes with ph test paper measured contact cotton, ph value should be less than 10. In addition to the above points, must also ensure that no bleeding at the grass-roots level, dust, grease, etc. In addition, the application of ceramic coating should be paid attention to the following: 1. Strictly abide by the product description and control its quality standards and construction requirements. 2. If you need to stop really stone paint batch, seam, drain pipe and Angle of Yin and Yang should be stop. 3. During the period of construction in advance to predict the weather, don't work in the rain. 4. Construction shall be carried out in strict accordance with the process, must not cut corners, to ensure that the final coating effect smoothly through the acceptance. We all know the importance of true stone paint construction. We can't careless. In order to ensure that the final effect, we must strictly follow the construction process, in order to achieve the best coating effect. Above is KeBao small series coating to share with you really stone paint basic processing method. True stone lacquer must undergo appropriate treatment before construction, otherwise the result will be greatly reduced. Everyone must master the above method, so there would be no problem in the construction. I hope this is helpful to everyone. Interested in really stone paint friend can read more about really stone paint the KeBao painting teach everyone spraying wall really stone paint steps 'of information.
Chat Online
Chat Online
Chat Online inputting...
Sign in with: