Speak with authority, quality is trustworthy.

KeBao: diatom ooze coating construction scheme

by:Opal     2021-01-18
Diatom ooze coating can meet consumer demand for environmental protection, health, and personalized art. Diatom ooze coating is semi-finished products, its ultimate decorative performance and construction technology has much to do. In order to guarantee the construction quality of diatom ooze coating, Cobo will the employees properly construction technology and construction method of training, and ask the construction personnel in strict accordance with the technical requirements for construction.


deployment of diatom ooze coating points:


1, add the right amount of water


prepare materials and tools, foundation treatment, can prepare diatom ooze. Gold pegasus diatom ooze paint, for example, can be divided into dry powder material, fine texture and coarse sand material. According to the construction quality of a material, water ratio of diatom mud = 10. 7 - 0. 8, for some effects of water ratio can be adjusted according to the construction of a little. With the project with the effect of adding water ratio must be consistent, to ensure the consistency of color. Generally to add 90% of the water in the container, the remaining 10% is used for adjusting the viscosity before use.


2, add paste


if it is to make color diatom ooze design, need to add the paste. Not all paste compatible with materials, add the paste must be compatible with same brand products. Decided to paste test in advance. To the bottom, mixing, pay attention to the stirring paste to disperse evenly.


3, plus the diatom ooze coating


check the packaging is complete, remove the dirt of the surface outside packing bag, sealed with scissors to open the bag. First, add 70% of the material slowly into the bucket, then use blender mixing. The water completely mixed powder and paste, add the rest of the materials into the barrel, continue to stir until the material into a fine paste ( No particles or block) 。 Before formal construction, with the remaining water adjust construction viscosity, then stir a few minutes. When using the surplus material that day, please scrub the barrel mouth edge, sealing preservation. The second day after mixing can continue to use.


batch of scraping the diatom ooze construction points:


1. Diatom ooze twice, the first time ( The thickness of 1. 5 mm or so) After the completion of 50 minutes ( Depending on the local climate, appropriate to keep the surface not hands, if panty-less filled with material) And the second ( The thickness of 1. 5 mm or so) 。 After apply with a spatula and collecting light, then made design tools. Production design takes a long time, some design needs to be done before collection.


2. Don't be too thin or too thick for the first time, to moderate; Do not use materials exposed to the diatom ooze. After finished order must be a natural dry. Dry degree examination and methods: stand at the side of the face to the direction of the sun's rays, check the metope. If metope have water reflection, it is necessary to continue to wait for dry; If there is no reflection, large area can be secondary construction.


3. Brush the second time, the use by light spatula will flatten entire wall, ready to clean towel will by light wipe off the leftover material on the spatula.


4. Pressure, using the same method to check metope of dry and wet conditions. If the surface reflection is no longer visible, can operate the texture pattern; Pressure light again after completion.


spraying method construction points:


strict inspection before construction putty layer is in line with the requirements; Thing such as door, window, furniture, wooden floor is good protection; Materials must be carried out in accordance with the cloth of water than the preparation; Ready to try first, adjust the amount of oil spray gun and air pressure; Spray to move arms, hands and feet, the eyes, simultaneously. Found that the problem handled in time; When spraying, the moisture content of the preparation of the coating shall not be casually.


spraying and route in order to determine influence the whole process of spraying, spraying, spraying and coating should be determined before the order. From the overall layout, to follow 'near far before, after the first, after the first out' principle. In general, spraying can be according to the ceiling before metope, the interior before


diatom ooze coating is indoor material, cannot be used in outdoor. Should be paid attention to in the process of storage and transportation, waterproof, don't directly in the wet ground.


construction be careful not to use the air conditioner, fan or a window ventilated. Increasing the difficulty of texture build dry too fast.


deployment of diatom ooze paint, please pay attention to the use of masks and other protective equipment. When mud accidentally splashed into eyes, immediately clean with clear water. If there are any abnormal, please go to a doctor diagnosis.