Speak with authority, quality is trustworthy.

Stone coating these detail engineering quality is of great significance for you!

by:Opal     2021-01-18
When using stone coating you notice these details? Before daub stone paint. The spring and autumn period and the two season temperature difference is very big. Colorful coating of ability in swimming is in 5 ~ 15 ℃ low temperature storage, viscosity will increase, affect the storage effect, is not conducive to the construction. Storage conditions should be above 10 ℃. Do not need dilution stone paint, surface slight stratification is a normal phenomenon. When using, should mix a little, then spray. It is best to two barrels down 2 - together 3 times. Do not violent mixing in order to avoid broken particles and affect adornment effect. Stone paint in construction process is easy to appear, especially at low temperature. Stone paint spraying easy cracking in low temperature, coating is too thick to sag, drying is slow, the early rain variable white, etc. When the environment temperature is less than 5 degrees, do not allow the construction. When temperature is below 10 ℃, ensure that the underlying dry, and in the morning 9:00 PM to 15:00 between the spray coating, coating to ensure dry molding before sunset. The construction of low temperature, if the spray density is higher, Color dot distribution is more than 50%) And survival, should be two construction, to avoid a coating thickness; Otherwise, the crater is easy to appear, subsidence is also easy to happen. Stone paint to paint above, otherwise the water will become white. ( Recommended flat mask should highlight, the rough mask should be matte. ) Color general should be more than 24 hours after spraying paint, paint at low temperature is completely dry before painting.
Chat Online
Chat Online
Chat Online inputting...
Sign in with: