Skin and skin?
Reason: the main use inferior putty, putty maintenance time is too short, hardness, surface treatment is not clean, base material the high humidity.
Suggested processing method: remove processing, brush again cotea metope fixed permeability primer, and then use cotea triad putty (
Waterproof, elastic, putty)
Blow to batch, meet the coating requirements after besmear again in the process of coating, coating, etc.
The color difference?
Reason: the color difference between different batches;
With big batch chromatism, paint construction time interval is too long.
Recommended approach: the same metope to use the same material as far as possible, a spraying the same wall, shorten the construction interval.
Hang?
Reason: coating is too thick, construction distance is too small and too much traffic, etc.
Methods: before each spray, spray, try, try to adjust according to the state of spraying, if there is no exception, spraying effect for large-scale construction again.
Suggest debugging related equipment (
Output pressure, paint, etc. )
。
)
Before spraying.
Crack?
Reason: too thick coating, spray coating at low temperature processing methods: suggest serious crack, and then evenly spray it again.
'Bian base?
Reason: the wall moisture content is exorbitant, high basicity processing method: remove processing, brush again good wall fixed permeability primer, and then using putty (section plus 3 in 1
Waterproof, elastic, putty)
Blow to batch, meet the coating requirements, and then used in construction, stone coating, etc.
Flowers?
Reason: in the process of spraying film thickness is not uniform, a man not spraying spraying method difference is too big.
Recommended processing method: before spraying, it is recommended that the adjusted spraying equipment (
Output pressure, paint, etc. )
。
)
One operator to normal, normal effect a wall spraying construction.