Takeaway: domestic existing operating room metope material selection is drab, generally low is choi steel, high-grade electrolytic plate. These need to be pieced together, splicing unavoidably produce cracks, easy to dust, not easy disinfection sterilization, so it is difficult to meet the requirements of the operating room clean sterile. My company specializes in operating room metope for this system solutions. The performance of the operating room must have a professional paint must be water-based environmental protection, and has strong adhesion, good antimicrobial durability, fouling resistance and good anticorrosive and other comprehensive performance.


hospital, nanjing institute of technology of nanjing public health bureau approved level of first-class hospital, affiliated with nanjing university of science and technology, since August 2011, hospital relocated to a new building a new school building area of 11600 square meters, 120 hospital beds, the hospital is equipped with preventive care, internal medicine, surgery, gynecology, ent, ophthalmology, dental, medical science, pharmacy, regions, physical therapy department, inpatient 22 departments, has formed on medical treatment, disease prevention, within surgery as the main body of a comprehensive hospital. Now bear the faculty, students, families, other universities, and the floating population of more than 60000 people of medical treatment, prevention, health care tasks.

by & other; Bright leopard & throughout; Project agent in nanjing polytechnic university hospital operating room renovation project was completed in today, this project USES metope of light leopard operating room system solutions, recognised by the hospital height; Bright leopard antibacterial coating using shell water-based food-grade resin research and development production, a two-component water-borne recipe, not add sterilization mildew agent, antibacterial rate > 99. 98%, the hospital system ideal metope protective material.










material:
primer, using water-based polyurethane anti-corrosive primer, and metal base material has good stick relay, bonding strength for the level 0, at the same time materials by adding rust fillers, etc. , can achieve the purpose of rust.
paint, USES bright leopard antibacterial composite isolation paint, can achieve very good adornment and bacteriostatic effect, verified by a third party inspection agencies bacteriostatic effect > 99. 98%.
the paint coat, this product is a two-component waterborne polyurethane material, has a matte effect, is cooperating with bright leopard antibacterial compound isolation layer of paint finishing coating, its high hardness, hardness > 2 h, at the same time can provide very good corrosion resistant effect.
construction technology:
( 1) Foundation treatment: electrolytic plate joining together after, to burnish of solder joints, grinding, for solder joints and flat-fell seam using putty to repair, after being atomic ash dry solid, integrated with 80 mesh sandpaper again, clean up the dust.
( 2) Primer, can use spray or roller coating construction, primer is A two-component materials, in the correct proportion A: B = mixture ratio of 8:1, blend to mix, add AB 15 to 20% of the total water, and 2 ~ 3 minutes, stirring the airless spraying, dosage of 0. 1KG/m2。 。 Construction environment temperature 5 ℃ above, humidity below 80%. To prevent back to rust, primer the best construction in polishing complete 12 hours.

( 3) Paint, coating can be used or roller coating construction, paint is A two-component, in the correct proportion A: B = 1:1 ratio of mixed and blend to mix with AB 10 ~ 15% of the total water 2 ~ 3 minutes, stirring can begin construction, dosage of roller coating 0. 2 kg/m2, spraying dosage is about 0. 25 kg / m2。

( 4) Cover light lacquer, use roller coating or coating construction, in the correct ratio of A: B = 6:1 mixture, stir well to construction, the dosage is about 0. 1 kg/m2, completely cure time for 48 hours.


if you are interested in the above light leopard hospital antimicrobial coating or have any questions, please click on contact us page on the right side of the online customer service, or call: 400 - 9932 - 998, bright leopard coatings & ndash; — You close the way of purchasing consultant.