Speak with authority, quality is trustworthy.

Really stone paint exterior wall construction standard interpretation ( Recommend collection)

by:Opal     2021-01-25
1, the outer wall heat preservation acceptance - at the local level Scraping the exterior wall of flexible waterproof putty - Exterior wall of flexible waterproof putty acceptance - Besmear brushs - seal primer Framework of pay-off - Scratch - flat-fell seam coatings The seam tape - Besmear brushs really stone paint - Partition seam tape - off Really stone paint surface grinder Spray paint - Really stone paint acceptance. 2. Really stone paint besmear to brush can be divided into two times, each time brushing at least 2 hours. Should be paid attention to during the construction of the thickness control, prevent leakage of coating, fall off, infiltration, and white. 3. Daub really stone paint for the first time, first in the framework of bearing cover paper seams on the quick apply a layer, dry 10 minutes, then daub the entire surface, ensure no frame joint cracking. 4. Daub after really stone paint, random remove the tape. Must be careful to remove the tape, in order to reduce the influence of really stone paint edge horn. 5. Polishing: really stone paint surface with 400 - 600 mesh sandpaper gently wipe really stone paint surface raised sand and sharp corners. Don't use too much power. This can improve the aesthetic feeling of really stone paint, effectively reduce the acute Angle, avoid dust accumulation. 6. Spray paint: after the completion of the stone paint, spraying coating surface to dry ( 24 hours of sunshine, rain should defer the drying time) 。 6. 1. Paint should be in strict accordance with the products specified in the dilution ratio of dilution. Fully mixing primer should be paid attention to when diluted to ensure uniformity. 6. 2, paint construction temperature shall not be less than 10 degrees Celsius. 6. 3. Paint can spray, brush or roller coating, dosage is 0 per square metre. 2 - 0. 3 kg. Coating should be top-down coated in turn. 6. 4. After construction, colour and lustre is consistent, without prolapse, the bottom and inside product material. 6. 5. Paint should be in strict accordance with the products specified in the dilution ratio of dilution. Fully mixing primer should be paid attention to when diluted to ensure uniformity. 6. 6. Paint can spray, brush or roller coating, dosage is 0 per square metre. 2 - 0. 3 kg. Coating construction should be from top to bottom in turn. 1. 5 after construction, colour and lustre should agree, without prolapse, the bottom and inside product material.
Chat Online
Chat Online
Chat Online inputting...
Sign in with: