The summer really stone paint construction knowledge

by:Opal     2021-01-18
Summer is the exterior really stone paint construction peak. Summer climate characteristics can make the wall really stone paint emulsion stronger, sunshine time is longer, so can a modest increase in construction time, so as to shorten the construction period. As a result, many engineering construction choose summer construction for external wall really stone paint. Today we are going to share a few common issues in the summer really stone paint construction.


1 safety first summer the average temperature is high, it is important to note that high temperature work. Construction site is usually in sorching summer, be sure to avoid the supervision of the construction personnel. Can adjust work progress in the work, to avoid the hot weather, choose the morning 5:00 - 11, 3:00 this afternoon At 7:00 in the construction. At the scene, be sure to do the life safety of the construction workers. On a hot summer day, the workers more and ignore the commercial insurance by the fear of cold steel wire rope, and high temperature and high temperature to fall from a height of workers brought serious damage!


avoid mildew raw materials, because of the high average temperature in summer. Really stone paint after long-distance transportation, heat transport. If transport to the construction site, all raw materials shall be in room shady and cool place. It is forbidden to direct the related raw materials exposed to outdoor natural light, in case the commodity mould, endangering the construction.


3 note really stone paint store. High average temperature in summer. Really stone paint store must be resistant to sunlight. Should be stored in a cool and warehouse. If there is no warehouse, should build sun-shade net, in order to avoid really stone paint dry film formed in the paint bucket and caking, endangering the construction.


4 solve summer mean temperature is high, really stone paint dry faster. The joints are easy to appear asymmetric sparse lanatoside. So the termination of the parts of the coating to be moderately spraying, behind can draw a picture. Slow title


then, ensure that really stone paint surface layer is thin and uniform; Or a reasonable method of dealing with summer-planting flowering.


5. The sun on the back of the building wall is composed of four walls. Construction, the choice of his back to the side of the sun, can not only resist sunlight, reduce the drying speed of really stone paint layer, and can resist the supervision of construction personnel, to ensure construction quality.


6, pay attention to weather changes, listen to the weather forecast, to grasp the weather change in time, and considering the really stone paint drying, manic the time required for raw material after construction, in order to avoid construction has just started to rain soon, causes the damage of surplus raw materials and artificial service.


7. Guarantee the construction of cohesion. The hot weather made building materials, fast drying, really stone paint construction must be stable of cohesion of architectural coatings. If for large electric hanging basket construction, construction work must be appropriately increased the same total number of the workers, in order to improve the work efficiency, keep working face wet reinforced lap.


8 civilized construction in construction, construction site closed doors and Windows and the maintenance; Banned from bottom to top construction in order to resist colour environment pollution; Dismantling reliable construction technology of iron frame or other workers, untouchable, damage or trample on the wall.